In 2014 we undertook a massive project with specialist application in this waste energy project. We supplied a full smoke ventilation and roof ventilation package (supplied and installed). The project also involved a free cooling system for the turbine hall which included massive (5mx5m) motorised dampers, acoustic louvres, roof extract fans and acoustic penthouse louvres. The main part of the project was the supply and install of the duct system which involved the admin area, Ash Bunker area (epoxy rated C5 duct) and turbine exhaust duct (2mx2m). AHUs supplied also.